Upper-Level Tasks
On the upper-level task management page, you can process tasks assigned by the upper level. The upper-level administrator creates tasks, which can be assigned to lower-level nodes in the form of files. After viewing a task, a lower-level node administrator can feed back the content and attachment to the upper-level node.
Parameters
- Task ID: ID of the task created by the upper level.
- Task Description: Description of the upper-level task.
- Task Attachment: File included with the upper-level task.
- Enabled At: Time when the upper-level task was enabled.
- State: Whether the current node has provided feedback for this task. The initial state is Not Fed Back. After feedback is provided, the state changes to Fed Back.
- Feedback Content: Content fed back by the current node.
- Feedback Attachment: Attachment fed back by the current node.
- Feedback Time: Time of the latest feedback. A lower-level node can continuously update the feedback content until the task is closed. The feedback time records the last time when feedback was submitted.